Engineering Reports & NH DES/EPA Correspondence Preliminary Rapid Infiltration Basin Siting Report Nov 2022 EPA Findings of Violation & Order of Compliance Sep 2022 Technical Memorandum - Lagoon Treatment Optimization Study - FINAL NH DES Letter Re: Available Sewer Capacity & State Permit Process Sewer Usage Analysis | Capacity Determination 2.15.23 (Final)